Loading...

Next Gen Jammer Increment 1 on track

Next Gen Jammer Increment 1 on track - Hallo friend US WORD ARMY, In the article you read this time with the title Next Gen Jammer Increment 1 on track, we have prepared well for this article you read and download the information therein. hopefully fill posts Items AIR FORCE, Items ARMY, Items INTELLIGENCE, Items NAVY, Items SPECIAL FORCES, we write this you can understand. Well, happy reading.

Loading...
Title : Next Gen Jammer Increment 1 on track
link : Next Gen Jammer Increment 1 on track

see also


Next Gen Jammer Increment 1 on track

The Airborne Electronic Attack Systems and EA-6B program office (PMA-234) of the US Naval Air Systems Command (NAVAIR) completed a critical design review (CDR) for the AN/ALQ-249 Next Generation Jammer (NGJ) Increment (Inc) 1 Mid-band program at Naval Air Station Patuxent River, Maryland, in late April.

The system is now in the Engineering and Manufacturing Development phase with Raytheon Space and Air Systems, the pod prime contractor, and Boeing, the EA-18G GROWLER aircraft integration prime contractor. The AN/ALQ-249NGJ Inc 1 Mid-band capability, once fielded, will transform the way the U.S. Navy conducts electronic warfare.

The system is now in the Engineering and Manufacturing Development phase with Raytheon Space and Air Systems, the pod prime contractor, and

Loading...
title="Boeing">Boeing, the EA-18G GROWLER aircraft integration prime contractor. The AN/ALQ-249 NGJ Inc 1 Mid-band capability, once fielded, will transform the way the U.S. Navy conducts electronic warfare.

Next Generation Jammer (NGJ) Increment 1 Mid-band program at Naval Air Station Patuxent River, Maryland, in late April.

During CDR, it was determined that the design and development are on track to meet crucial warfighter requirements, and fabrication, demonstration, and testing could proceed. The system is now in the Engineering and Manufacturing Development (EMD) phase with Raytheon Space and Air Systems, the pod prime contractor, and Boeing, the EA-18G aircraft integration prime contractor. The AN/ALQ-249 NGJ Inc 1 Mid-band capability, once fielded, will transform the way the U.S. Navy conducts electronic warfare.

The system will address the emerging, advanced threats and increased threat density using the latest Active Electronically Scanned Array, also known as AESA, digital and software-based technologies.

This article was first published by the US Naval Air Systems Command (NAVAIR): www.navair.navy.mil

Let's block ads! (Why?)



from Defense Update: http://ift.tt/2qW9F0D
via Defense News


thus Article Next Gen Jammer Increment 1 on track

that is all articles Next Gen Jammer Increment 1 on track This time, hopefully can provide benefits to all of you. Okay, see you in another article posting.

You now read the article Next Gen Jammer Increment 1 on trackwith the link address https://uswordarmy.blogspot.com/2017/05/next-gen-jammer-increment-1-on-track_18.html
Loading...

Subscribe to receive free email updates:

Related Posts :

0 Response to "Next Gen Jammer Increment 1 on track"

Post a Comment