Loading...

Tilted Indian Naval Frigate Resurrected At A Cost Of 20 Cr, To Become Operational By April

Tilted Indian Naval Frigate Resurrected At A Cost Of 20 Cr, To Become Operational By April - Hallo friend US WORD ARMY, In the article you read this time with the title Tilted Indian Naval Frigate Resurrected At A Cost Of 20 Cr, To Become Operational By April, we have prepared well for this article you read and download the information therein. hopefully fill posts Items AIR FORCE, Items ARMY, Items INTELLIGENCE, Items NAVY, Items SPECIAL FORCES, we write this you can understand. Well, happy reading.

Loading...
Title : Tilted Indian Naval Frigate Resurrected At A Cost Of 20 Cr, To Become Operational By April
link : Tilted Indian Naval Frigate Resurrected At A Cost Of 20 Cr, To Become Operational By April

see also


Tilted Indian Naval Frigate Resurrected At A Cost Of 20 Cr, To Become Operational By April


Loading...
width="400">
Indian Navy's 3850-ton guided missile frigate INS Betwa  (F-39), which got tilted and fell on the side on December 5, 2016, at Mumbai Dockyard, while undocking, killing 2 sailors was resurrected today upright and afloat on even keel. It has been done at an approximate cost of Rs 20 crore. She will become operational in April this year.


thus Article Tilted Indian Naval Frigate Resurrected At A Cost Of 20 Cr, To Become Operational By April

that is all articles Tilted Indian Naval Frigate Resurrected At A Cost Of 20 Cr, To Become Operational By April This time, hopefully can provide benefits to all of you. Okay, see you in another article posting.

You now read the article Tilted Indian Naval Frigate Resurrected At A Cost Of 20 Cr, To Become Operational By Aprilwith the link address https://uswordarmy.blogspot.com/2017/02/tilted-indian-naval-frigate-resurrected.html
Loading...

Subscribe to receive free email updates:

Related Posts :

0 Response to "Tilted Indian Naval Frigate Resurrected At A Cost Of 20 Cr, To Become Operational By April"

Post a Comment